WHY GLASS FOAM GRANULATE?
simply put:
It saves you money and time and provides you with
numerous application options.
§ Savings due to less excavated material because of low structural height
§ Savings because blinding and drainage layers as well as frost barrier can be omitted
§ Savings because cutting slab products is no longer necessary
§ Savings of up to 15% per square metre insulated floor slab when compared to traditional floor design
§ Savings due to lower construction time – the floor slab can be concreted immediately after compacting of the granulate
§ Savings due to long-term reduction of heating costs
THE BENEFITS ARE APPARENT –
AND MAY SOON APPEAR IN YOUR FOUNDATION, TOO.
Construction cost comparison
|
Construction project: Residential/office building Structural element: Perimeter insulation |
Material |
Without glass |
With glass |
|
|
|||
|
Film or geo-textile as separating layer |
0.2 mm |
0.70 € |
0.70 € |
|
Insulation, incl. laying and waste |
10.0 cm |
15,90 € |
- |
|
Glass foam granulate Perimeter 50, incl. installation |
20 cm |
- |
17,90 € |
|
Blinding layer made of lean concrete |
6.0 cm |
8.50 € |
- |
|
Capillary-breaking layer |
20.0 cm |
7.00 € |
- |
|
Excavated soil and removal without glass foam granulate |
58.0 cm |
11.60 € |
- |
|
Excavated soil and removal with glass foam granulate |
40 cm |
- |
8.00 € |
|
Geo-textile 150 g/m² |
1.5 mm |
150 € |
1.50 € |
|
Ground level generation |
- |
1.50 € |
1.50 € |
|
Construction costs per m² in EURO |
- |
46,70 € |
29,60 € * |
|
With glass foam granulate the construction costs are lowered by app. |
EURO 17,10/m² |
|
*Further savings potential possible by omitting the frost barrier and using activated floor slab! |
Without TECHNOpor glass foam granulate:
→ Construction of a frost-free foundation.
→ Additional costs for excavation and construction of the frost barrier, thermally insulated.
→Thus danger of thermal bridges.
With TECHNOpor glass foam granulate:
→ High load-bearing capacity and thermal bridge-free construction.
→ Activated floor slab and omission of floor construction possible.